Sign in for recommendations. New member? Start here.

The Monolithic EcoShell I and EcoShell II

madarkb rated 6 months ago
From the page: "overnight. Ecoshell 6. Directly after the second 1/4 to 1/2 inch of shotcrete is sprayed, insert barbed rebar hangers into the still wet concrete. Then spray over the barbed rebar hangers with the third 1/4 to 1/2 inch coat of concrete to lock them in place. Ecoshell"

Like this page from monolithic.com?

1 Reviews

Characters left: 4000


madarkb rated 6 months ago
From the page: "overnight. Ecoshell 6. Directly after the second 1/4 to 1/2 inch of shotcrete is sprayed, insert barbed rebar hangers into the still wet concrete. Then spray over the barbed rebar hangers with the third 1/4 to 1/2 inch coat of concrete to lock them in place. Ecoshell"